| City of Safford - Discovery Tank |
Construction of approximately 4,320 linear feet of 12-inch diameter pipe, with related valves and fittings and erection of a 3,000,000 gallon concrete storage tank and related appurtenances in order to repair the City’s largest water storage facility due to deterioration. | DISOVERY.pdf File Size: 2.24 MB |
| City of Safford - Hillcrest Storage Tank |
Construction of approximately 6,116 linear feet of 12-inch diameter pipe, with related valves and fittings and erection of a 2,000,000 gallon concrete storage tank and related appurtenances. This project site was purposely sited at the largest demand and future growth area at Hillcrest in order to repair the City’s largest water storage facility due to deterioration. | HILLCREST.pdf File Size: 2.42 MB |
| Duncan Water Renewal |
Master planning, funding procurement, project management, design, permitting and construction administration of multi-phase water renewal project for the Town of Duncan. | DUNCAN-H20-RENEWAL.pdf File Size: 0.85 MB |
| FCI Sewer Main |
Sewer main extension from the City of Safford to the FCI Correctional facility south of Safford | FCI-SEWER.pdf File Size: 0.86 MB |
| FCI Water Main Extension |
Water main extension from the City of Safford to the FCI Correctional facility south of Safford | FCI-WATER.pdf File Size: 0.91 MB |
| Kempton Well Field Tie-In |
24” water transmission main to tie in main source supply for the City of Safford and surrounding communities | KEMPTON.pdf File Size: 0.62 MB |
| New Model Canal |
Extensive bank protection facilities and riverbed stabilization structures to repair flood damage | NEW-MODEL.pdf File Size: 0.78 MB |
| Willcox WWTP |
Expansion to the City of Willcox's Wastewater Treatment Plant, including numerous additions and upgrades | WILLCOX-WWTP.pdf File Size: 1.47 MB |